VOLKSWAGEN GOLF IV

since 1997 of release

Repair and car operation



Foltsvagen Golf 4
+ 1. Maintenance instruction
- 2. Engine
   - 2.1. Petrol engines
      2.1.1. Technical characteristics
      2.1.2. Removal and installation of the bottom mudguard of a motor compartment
      + 2.1.3. Engine 1,6-/1,8-I
      - 2.1.4. Engine 1,4-I
         + 2.1.4.1. Gear belt
         - 2.1.4.2. Head of the block of cylinders of the engine
            2.1.4.2.1. Removal
            2.1.4.2.2. Installation
      + 2.1.5. The engine 2,3 - I-VR5
      2.1.6. Compression check in engine cylinders
      + 2.1.7. Removal and installation of a poliklinovy belt
      + 2.1.8. Recommendations about engine oils
      + 2.1.9. Circulation of engine oil
      2.1.10. Check of pressure of oil and sensor of pressure of oil
      2.1.11. Removal and installation of the oil pallet
      2.1.12. Engine start after major maintenance
      2.1.13. Diagnostics of malfunctions of the engine
      2.1.14. Main malfunctions of system of greasing
   + 2.2. Diesel engines
+ 3. Cooling system
+ 4. Fuel system
+ 5. Exhaust system
+ 6. Ventilation and heating system
+ 7. Coupling
+ 8. Transmission
+ 9. Suspension brackets and power shafts
+ 10. Steering
+ 11. Wheels and tires
+ 12. Brake system
+ 13. Body
+ 14. Electric equipment and electroschemes





2.1.4.2. Head of the block of cylinders of the engine

2.1.4.2.1. Removal

GENERAL INFORMATION

Head of the block of cylinders of the engine 1,4-I

1–top part of a casing of a gear belt;
2–main gear belt.
Check a condition of a gear belt. The direction of rotation of a gear belt should not change. Do not bend a gear belt;
3–auxiliary gear belt. The direction of rotation of an auxiliary gear belt should not change;
4–a bolt, 10 Nanometers + to tighten on a corner 90 °. At installation it is necessary to use new bolts;
5–casing of high-voltage wires;
6–camshaft case. At installation it is necessary to put on a surface interfaced to a head of the block of cylinders a thin layer of VW-AMV 188 003 hermetic. Installation of the case of a camshaft make strictly vertically;
7–bolt, 10 Nanometers;
8–pin;
9–yoke. Before installation grease working surfaces of a yoke;
  10-a supporting element. With hydraulic adjustment of klapanny gaps. Installation of supporting elements make strictly on the places;
11-bolt of fastening of a head of the block of cylinders. At installation it is necessary to use new bolts. A tightening of bolts make in the same sequence, as well as on the engine 1,6-/1,8-I;
12-head of the block of cylinders;
13-laying of a head of the block of cylinders. At installation it is necessary to use new laying;
14-tension roller of a connecting gear belt;
15-bolt, 20 Nanometers;
16-back casing of a gear belt;
17-bolt, 20 Nanometers;
18-eye

Prevention

The general operations on removal of a head of the block of cylinders are given in subsection 2.1.3.3.1. The operations concerning the engine 1,4-I are given in this subsection only.


On the engine 1,4-I camshafts are established in the case of camshafts separate of a head.

PERFORMANCE ORDER
1. Remove both gear driving belts.
2. Unscrew a bolt of fastening of the valve of the direction of exhaust gases (1), and also a bolt (2) fastenings of an arm of the electric socket.
3. Unscrew a back casing of a gear belt.
4. Gradually and consistently outside inside weaken, and then unscrew bolts of fastening of the case of camshafts.
5. Remove the case of camshafts. Remove yokes together with a supporting element and arrange them so that at assembly they rose on the places.
6. Weaken a collar and remove from the thermostat case a hose of system of the cooling, going to the water pump.