If at high humidity of air, for example, during a rain, windows mist over, it is recommended to make the following:
PERFORMANCE ORDER |
1. The switch B (see fig. Governing bodies ventilation and an otpleniye) put on a step 2 or 3. |
2. The handle A if it is necessary to transfer to a zone of heating of air. |
3. The handle C put on. |
4. Nozzles 3 close. |
5. Through nozzles 4 it is possible to direct in addition warm air on lateral glasses. |
|
|