VOLKSWAGEN GOLF IV

since 1997 of release

Repair and car operation



Foltsvagen Golf 4
+ 1. Maintenance instruction
+ 2. Engine
- 3. Cooling system
   3.1. Dolivka of cooling liquid
   3.2. Structure of a mix of cooling liquid
   + 3.3. Replacement of cooling liquid
   - 3.4. Thermostat
      3.4.1. Removal
      3.4.2. Check of operability of the thermostat
      3.4.3. Installation
   + 3.5. Radiator and radiator fan
   + 3.6. Water pump of petrol engines
   + 3.7. Water pump of diesel engines
   3.8. Hoses of system of cooling
   3.9. Malfunctions of system of cooling
+ 4. Fuel system
+ 5. Exhaust system
+ 6. Ventilation and heating system
+ 7. Coupling
+ 8. Transmission
+ 9. Suspension brackets and power shafts
+ 10. Steering
+ 11. Wheels and tires
+ 12. Brake system
+ 13. Body
+ 14. Electric equipment and electroschemes





3.4.3. Installation

PERFORMANCE ORDER
1. Clear a surface interfaced to a sealing ring.
2. Establish the thermostat into place. On petrol engines 1,8-I and diesel engines establish the thermostat and turn it on 90 ° clockwise. It is necessary to establish the thermostat so that the channel for removal of air was directed up.
3. Grease a new sealing ring with fresh cooling liquid and establish into place.
4. Establish a connecting branch pipe and screw it bolts, having tightened them the moment of 15 Nanometers.
5. Fill in cooling liquid in cooling system.
The petrol engine 1,8-I Turbo with the conditioner
6. Establish into place the compressor of the conditioner and tighten bolts of fastening of the compressor the moment of 45 Nanometers. Establish poliklinovy a belt.
7. Start the engine and check tightness of system of cooling.