VOLKSWAGEN GOLF IV

since 1997 of release

Repair and car operation



Foltsvagen Golf 4
+ 1. Maintenance instruction
+ 2. Engine
- 3. Cooling system
   3.1. Dolivka of cooling liquid
   3.2. Structure of a mix of cooling liquid
   - 3.3. Replacement of cooling liquid
      3.3.1. Plums of cooling liquid
      3.3.2. Filling of system of cooling
   + 3.4. Thermostat
   + 3.5. Radiator and radiator fan
   + 3.6. Water pump of petrol engines
   + 3.7. Water pump of diesel engines
   3.8. Hoses of system of cooling
   3.9. Malfunctions of system of cooling
+ 4. Fuel system
+ 5. Exhaust system
+ 6. Ventilation and heating system
+ 7. Coupling
+ 8. Transmission
+ 9. Suspension brackets and power shafts
+ 10. Steering
+ 11. Wheels and tires
+ 12. Brake system
+ 13. Body
+ 14. Electric equipment and electroschemes



3.3.2. Filling of system of cooling

PERFORMANCE ORDER
1. Prepare demanded amount of cooling liquid from 50 % of water and 50 % of antifreeze with an anticorrosive additive of G12.
Petrol engines 1,6/1,8/2,3-I and diesel engines.
2. Connect a hose of supply of cooling liquid to the oil heat exchanger and fix it a collar.
3. Screw in a carving stopper plum of cooling liquid in an opening in a radiator and tighten it the demanded moment.
4. Establish the bottom mudguard of a motor compartment.
5. Lower the car.
6. Move a regulator of temperature of system of heating to provisions of the maximum temperature.
7. Fill in cooling liquid in a broad tank to max label.
8. Start the engine and hold it within 2 minutes on turns of 1500 rpm.
9. Close a cover of a broad tank.
10. Start the engine on turns of idling and warm up it before turning on of the electric fan of a radiator.
11. Switch off the engine and let's to it time cool down.
12. Check level of cooling liquid and, if necessary, finish it to norm.